Wednesday, May 30, 2012

BERYL

Tropical Depression Beryl as of 9:00 am this morning.  Heavy rain bands blanketed the area, however accoring to wunderground, the lot was spared the most of the earlier rain. 


 It has rained all morning however, and it doesn't look like it's stopping any time soon.


Radar as of 11:00 am - The lot appears to still have less than a half inch so far.


Radar as of 2:00 pm - Beryl has merged with an approaching cold front and the rain bands are now rain blobs.  Total precipitation models still show less than an inch at this point.


Radar as of 4:00 pm - Beryl has picked up speed and is moving off the coast, however it is still raining.

Tuesday, May 29, 2012

First Rough In

Before the concrete slab can be poured, the rough in plumbing for the basement has to be in place and inspected.

That was completed today.


This will be for our laundry room, a full bathroom and the discharge for the geothermal unit.


We also had some pipes put in around the garage/meter box area for any future wiring projects.

Thursday, May 17, 2012

Porta Potty

Well it's official. We can now start this project. lol.